Serving the entire state of Florida — free walkthrough & estimate

Completed bathroom remodel by Honchar Remodeling in Florida

Home › Our Work

Our Work

Real projects, real photographs, shot on site. Every before and after pair is the same room from the same spot.

Before & after

Drag the handle. That’s the same room.

Every one of these is shot from a marked spot on the floor — the same position before we start and after we finish. No staging tricks, no other rooms.

Before: dated bathroom with yellow wall tile, a worn vanity and an old mirror After: the same bathroom with a new vanity, large format tile and fresh paint Before After

Bathroom remodel

Yellow tile to a clean, modern bath

Full strip-out and refit — new vanity, mirrors, lighting and large-format tile throughout.

Before: shower cavity with a bonded waterproofing membrane being installed After: the same shower finished with tile and a frameless glass enclosure Before After

Shower conversion

The part you never see, done right

Bonded waterproof membrane over the whole wet area and a flood test before a single tile went on.

Before: bathroom at drywall stage with bare walls and an unfinished floor After: the same room with a freestanding tub, walk-in shower and double vanity Before After

Master bathroom

Bare drywall to a finished master

Taken from drywall through waterproofing, tile, vanity and fixtures.

Before: open plan kitchen at drywall stage with the crew finishing joints After: the same kitchen finished with an island, cabinetry and wood flooring Before After

Kitchen build-out

Drywall through to a finished kitchen

Hung, taped and floated to a Level 5 finish, then painted and handed over for cabinetry.

Before: office with the ceiling opened up and drywall repairs in progress After: the same office finished, painted and fitted out Before After

Office ceiling

Ceiling rebuilt, room put back

Ceiling opened for access, re-hung and refinished, then the whole room repainted.

Before: commercial unit at steel framing stage with exposed services overhead After: the same unit with finished walls, doors and flooring Before After

Commercial build-out

Steel framing to a finished unit

Full commercial hang and finish, partitions, doors and flooring.

Before: the crew setting tile on the bathroom walls mid-remodel After: the finished bathroom with a floating vanity and tiled shower Before After

Guest bathroom

Remodeling a residential bathroom

We tore out all of the existing materials then relaid the tile, built the cabinetry, and finished the bathroom.

Before: residential living room at the start of the job After: the finished residential living room Before After

Residential Living Room

Teardown and refinishing flood damage.

Tore out the flooring, rotted drywall, and other things affected by flooding. Then we hung new drywall, laid new tile, repaired the fireplace, and added the wood slat accent wall.

Project gallery

Recent work across Florida

Want yours to look like this?

Free walkthrough, written quote, and a guarantee that does not expire when we drive away.

Free walkthrough·No obligation·Same business day reply